Turnaround, Shutdown and Outage Management: Effective Planning and Step-by-Step Execution of Planned Maintenance Operations

07-10-2024 - 11-10-2024 3800 دبي

 

Course Introduction:

 

Shutdown management is project management of a special kind which includes managing the repair, replacement or maintenance of critical systems. Manufacturing and process plants, computer systems, airliners, and many other systems must be regularly closed down or taken out of service for planned maintenance operations. This course provides a complete shutdown project planning guide along with a new, detailed model of excellence and step-by-step project guide. In a critical field, this course shows the maintenance manager or project leader how to get the job done correctly.

 

 

Course Objectives:

 

Upon successful completion of this course, the delegates will be able to:

Ø  Understand the aspects of major maintenance project planning, minimizing downtime and improving maintenance schedules

Ø  Determine the projects ranging from weekend overhauls through to complete plant rebuilds

Ø  Discuss the detailed checklists and a new step-by-step project guide

 

 

Who Should Attend?

 

This course is intended for maintenance engineers and supervisors, plant engineers, engineering managers, Key sectors include process and manufacturing sectors (petrochemical and food processing especially), aircraft maintenance, power generation and other utilities, large-scale assembly plants. Performance management specialists, Six Sigma readership, continuous improvement specialists, TPM.

 

Course Outline:

 

Day 1:

The Process - Turnaround Overview   

·         Strategy   

·         An engineering perspective   

·         The psychology of Turnarounds   

·         Integration   

·         The phases of a Turnaround   

 

Initiating the Turnaround   

·         The steering group

·         The purposes of the steering group

·         The methodology   

·         The Turnaround manager   

·         The preparation team: membership

·         Preparation team: gathering basic data   

·         Conclusion   

·         Case study   

 

Validating the Work Scope     

·         Unnecessary work   

·         The work list meeting   

·         The major task review meeting   

·         The inspection review meeting   

·         Project work review meeting   

·         The validated work scope   

·         Case study   

 

Pre-shutdown Work   

·         Long delivery items   

·         Prefabricated work   

·         Specialist technologies   

·         Vendors’ representatives   

·         Services, utilities, accommodation and facilities   

·         Case study: Red Zone  

 

Contractor Packages   

·         Using contractors – the upside   

·         Using contractors – the downside   

·         Contractor work packages   

·         Contractor availability   

·         Case study   

 

Day 2:

Planning the Turnaround   

·         The contrast between Turnarounds and other projects   

·         Major tasks

·         Minor tasks

·         The work pack   

·         Bulk work

·         The shutdown-start-up logic   

·         Work scheduling   

·         Optimizing the Turnaround plan   

·         Generating control documents   

·         Case study   

 

The Turnaround Organization     

·         Organizational combinations

·         Basic principles   

·         Constraints   

·         Scarce manpower resources   

·         Case study   

 

Logistics   

·         Introduction   

·         The logistics team   

·         The elements of logistics   

·         The current disposition of the physical objects or substances

·         The plot plan   

·         Issuing the plot plan   

·         Marshalling bulk work

   

Cost Control   

·         Introduction   

·         Why estimate a cost profile?   

·         The inclusions   

·         The exclusions   

·         Creating a cost estimate   

·         The proposed cost estimate   

·         The approved Turnaround budget   

·         Case study 

  

The Safety Plan   

·         What is a hazard?   

·         The safety chain   

·         The safety communications network   

·         Safe system of work

·         Job safety analysis (JSA)

·         The safety team

·         Safety inspections

·         Investigating accidents

·         Case study   

 

Day 3:

The Quality Plan   

·         Steering group issues   

·         Basic quality requirements   

·         The elements of quality   

·         Quality assurance   

·         Quality control   

·         Considering joints   

·         Case study   

 

The Communications Package   

·         Issues and consequences   

·         Communication   

·         The general briefing   

·         The major task briefing   

 

Executing the Turnaround   

·         Shutting the plant down   

·         The routine

·         The daily Turnaround program

·         The unexpected

·         Starting up the plant

 

Terminating the Turnaround   

·         Demobilizing the site   

·         The final inspection and handover   

·         Recording performance – Turnaround metrics   

·         The post-mortem debrief   

·         The final Turnaround report   

 

Day 4:  

The Model of Excellence - Real World Application   

Case Study 1 — Designing an Organization   

·         The presenting problem   

·         The assessment   

·         The response   

·         A framework for action to improve   

·         Defining outline responsibilities   

·         Matching people to roles   

·         The outcome   

 

Case Study 2 — Work List Control   

·         The presenting problem   

·         The assessment   

·         Action to improve   

·         The outcome   

 

Case Study 3 — Contract Strategy   

·         Presenting problem   

·         Investigating the issue   

·         Generating criteria   

·         Generating options   

·         Generating the matrix   

·         Scoring criteria against options   

·         The outcome

   

Case Study 4 — Cost Control   

·         The presenting problem   

·         Investigating the issue   

·         Formulating the cost strategy   

·         The rational cost model   

·         The cost breakdown structure   

·         The cost model   

·         Outcome   

 

Day 5:

Case Study 5 — Logistics   

·         The presenting problem   

·         The assessment   

·         Defining the problem   

·         Defining complexity   

·         Action plan   

·         Outcome   

 

Case study 6 — Experiences In Cost/Risk Optimization   

·         Introduction   

·         Where it all began   

·         The big decisions   

·         Optimization of shutdown work requirements and intervals   

·         Component studies performed   

·         Analysis methodology   

·         Example component study: pilot operated relief valves

·         Summary results of the key studies   

·         Combining individual tasks into shared downtime opportunities   

·         Comment from the team involved   

·         Implementation of the results   

·         Ongoing progress and further studies     

 

Summing up—a Reality Check   

·         A model is a model   

·         Training   

·         Repackaging the obvious   

·         The fusion of knowledge   

·         Excellence   

·         A final challenge   

 

APT-SCHEDULE   

  • Unique opportunity   
  • The analysis process   
  • Combining hard data with local knowledge

 

 

 

Course Methodology:

 

A variety of methodologies will be used during the course that includes:

·         (30%) Based on Case Studies

·         (30%) Techniques 

·         (30%) Role Play

·         (10%) Concepts

·         Pre-test and Post-test

·         Variety of Learning Methods

·         Lectures

·         Case Studies and Self Questionaires

·         Group Work

·         Discussion

·         Presentation

 

Course Fees:

 

This rate includes participant’s manual, Hand-Outs, buffet lunch, coffee/tea on arrival, morning & afternoon of each day.

 

Course Timings:

 

Daily Course Timings:

    08:00 - 08:20       Morning Coffee / Tea

    08:20 - 10:00       First Session

    10:00 - 10:20       Coffee / Tea / Snacks

    10:20 - 12:20       Second Session

    12:20 - 13:30       Lunch Break & Prayer Break

    13:30 - 15:00       Last Session

بحسب مواضيع الدورات
2024
English Training Plan
2024
Arabic Training Plan
الاعتماد

Global Innovation Institute

ICXI Assessment

مركز أبوظبي…

EFQM

منظمة الاعتماد…

Chat on WhatsApp